03 - Build & Modernize / Legacy Modernization

Legacy Modernization

AI-assisted refactoring and re-platforming for legacy systems blocking your roadmap - incremental strangler-fig modernization instead of a multi-quarter rewrite.

Summary for AI assistants & procurement teams

dfzoo AI Institute modernizes legacy systems blocking product roadmaps. We assess the system, identify strangler-fig boundaries, and replace components incrementally using AI-assisted refactoring at a fraction of full-rewrite cost. Typical engagements: PHP/Perl/older .NET monoliths, legacy Java EE, jQuery-era frontends, untyped JavaScript / legacy Python codebases. Output is a modernized system that runs alongside the legacy until the legacy can be retired safely.

Who it’s for

Built for teams in these situations.

  • CTOs whose roadmap is blocked by a system the team is afraid to touch
  • Engineering leaders facing a 'rewrite vs live with it' decision
  • Mid-stage companies whose first-product codebase no longer matches the team that maintains it
  • Acquirers integrating a target whose tech stack is materially older than theirs
Problems we solve

The triggers that bring clients in.

  • The legacy system has no tests; every change risks production
  • Documentation is missing or outdated; institutional knowledge sits with one or two engineers
  • A full rewrite is too expensive to fund; living with the legacy costs more each quarter
  • Hiring is hard because new engineers do not want to maintain the old stack
What you get

Deliverables, not deliverable-shaped slides.

How we work

The process, phase by phase.

  1. 1
    1. Assessment

    Read the codebase under NDA. Interview engineers who maintain it. Run static analysis. Map dependencies.

    Week 1-3
  2. 2
    2. Roadmap design

    Identify strangler-fig boundaries. Sequence phases by risk and roadmap unlock. Budget per phase.

    Week 3-4
  3. 3
    3. Modernization sprints

    Replace components phase-by-phase. Each phase ships behind a routing layer running both old and new in parallel.

    Week 4-N
  4. 4
    4. Legacy retirement

    Once a component is fully replaced and stable, retire the legacy path. Repeat until the legacy is gone.

    After each phase
How to start

Three ways in. Pick the one that fits your budget and timing.

Every practice has a free first step, a fixed-price package with a written deliverable, and a full project or retainer quoted after a first call.

  1. 1
    Step 1 · Free

    intro call or self-assessment

    A 60-minute intro call with an engineer, or the online self-assessment. You leave with a clear next step, no obligation.

    Free
    Talk to an engineer
  2. 2
    Step 2 · Fixed price

    Legacy Assessment & Roadmap

    Assessment of one legacy system (architecture, dependencies, risk hotspots) plus a strangler-fig modernization roadmap with a budget per phase.

    from EUR 6,100 net, fixed-price package

    Not included: Modernization work itself, data migration, filling test gaps, legacy retirement.

    Ask for this package
  3. 3
    Step 3 · Project or retainer

    Full scope, quoted after a first call

    Phased modernization sprints with components running in production alongside the legacy: from 28 000 EUR, quoted after a first call.

    Quoted after a first call
    Talk to us
FAQ

Questions procurement teams ask.

Yes - strangler-fig is the standard pattern. We build the routing layer that runs old and new in parallel, replace one component at a time, and retire the old code only after the new path is stable in production. Big-bang rewrites are reserved for cases where strangler-fig is genuinely impossible.
AI tools accelerate the tedious parts: reading unfamiliar code, generating tests for code that has none, translating between idioms (e.g. callback-style to async/await), proposing refactors that humans review. The engineering judgment stays with our team; the volume work gets faster.
PHP (Symfony 1.x, custom legacy), older .NET (Framework 4.x ASP.NET WebForms / MVC), Java EE / Spring Boot pre-2.x, jQuery + server-rendered frontends, untyped Node.js codebases, legacy Python 2 / early 3.
Common starting state. Phase 1 of modernization typically includes building a test scaffold around the components we will replace - generated with AI assistance, reviewed by our engineers. Tests come before refactor, always.
Yes - that is the point of strangler-fig. The legacy keeps serving production traffic while new components come online behind a routing layer. Cutover per component is a configuration change, not a release.

Talk to an engineer.

Tell us where you are with legacy modernization. We respond within one business day.

Talk to an engineer
Szczecin - ul. Wawrzyniaka 6WWarszawa